4M provides engineering support for many additional construction related activities.
COLUMN GUYING AND ERECTION

Column Erection, I-580, Reno, NV.
- -Column Erection plans
- -Cabled and rigidly braced rebar cages
FORM WORK
- – One and 2 Sided Retaining Wall Forming
- – Wall Panel Form liner Detailing
- – Lost Deck, Stem & Overhang Forming
EQUIPMENT ACCESS
- – Crane Trestles and Platforms
- – Crane Pads on Grade
- – Spreader Bars and Hoisting Apparatus
Crane Trestle, YBI Island, SF, CA
OTHER
- – Temporary Traffic Bridges
- – Existing Structure Temporary Bracing
- – Scaffolding and Work Platforms
- – Peer Review or Second Opinion (or stamp) of Engineered Plans
- – Pre-bid Preliminary Design and Consultation
- – Miscellaneous Wood, Steel and Concrete Structures